Total Inspections

total inspections project

Trellis by Aria – South Brisbane

Trellis by Aria in South Brisbane is a 12-storey residential apartment development comprising 110 units across two basement levels. Developments of this scale require early-stage defect identification to ensure construction issues are addressed within the defects liability period.

Total Inspections conducted a 12-month DLP inspection alongside a fire door audit, focusing on structural performance, finishing defects, and fire compliance across the building.

Project Overview: Multi-Level Residential Development

Trellis by Aria includes:

Mid-rise developments introduce layered risk across vertical services, shared infrastructure, and fire safety systems, requiring structured inspection coverage across all accessible areas.

Inspection Scope: 12-Month Defects Liability Period (DLP)

The 12-month DLP inspection is conducted shortly after construction completion, targeting defects related to workmanship, material performance, and early-stage building movement.

Internal Defects and Finishing Quality

Inspection focused on identifying defects within units and common areas, including:

Basement and Common Areas

Inspection extended to shared infrastructure such as:

Assessment included:

Fire Door Audit: Compliance and Safety Assessment

Fire door systems form a critical component of building safety and compliance in multi-residential developments.

Fire Door Condition and Functionality

The audit assessed:

Compliance with Fire Safety Requirements

Inspection focused on identifying visible issues that may impact:

Why 12-Month DLP Inspections Are Critical

The defects liability period provides a defined window for identifying and rectifying construction issues before responsibility shifts away from the builder.

Early Identification of Construction Defects

Defects identified at this stage often relate to:

Reducing Long-Term Maintenance Costs

Addressing defects early prevents escalation into larger structural or compliance issues.

Protecting Owners and Body Corporates

Inspection findings support:

Technical Approach for Multi-Residential Buildings

Mid-rise developments require consistent inspection across multiple units and shared systems.

Total Inspections applies:

This approach ensures coverage across both private units and common property.

Independent Reporting for Stakeholders

The inspection report provides:

Reports are used by:

Supporting Compliance and Asset Performance

The inclusion of a fire door audit strengthens compliance oversight, ensuring safety systems are assessed alongside general building defects.

For developments such as Trellis by Aria, this combined inspection approach provides:

Book a Building Defect Inspection

Total Inspections delivers DLP inspections and compliance audits across Brisbane and South East Queensland.

Call 1800 868 251 or visit https://totalinspections.com.au/ to arrange an inspection.